43 days = 43/7 = 61/7 weeks
2 months is 8 to 9 weeks. It could be from 59 to 62 days, with an average of 61 days (8 weeks 5 days)
if 7 x 10 is 70 then 7 x 9 is 61 So there are 9.4 weeks in 64 days
There are 61 weeks. 52 = 1 year +9 ------ 61 weeks
On the Gregorian Calendar, two months can be 59, 60, 61, or 62 days, which is 8 weeks and 3, 4, 5, or 6 days.
8 weeks and 5 days
61 weeks
43 days = 43/7 = 61/7 weeks
2 months is 8 to 9 weeks. It could be from 59 to 62 days, with an average of 61 days (8 weeks 5 days)
Oct has 31 days, november has 30 days. So 61 days
if 7 x 10 is 70 then 7 x 9 is 61 So there are 9.4 weeks in 64 days
Sice November has 30 days, and December 31, the total is 61 days. There are 7 days in a week, so the number of weeks left over for the year 2010 is 61 / 7 = 8.7 weeks.
As today is January 27, there are 61 days or 8 weeks and 5 days until March 29.
There are 61 weeks. 52 = 1 year +9 ------ 61 weeks
On the Gregorian Calendar, two months can be 59, 60, 61, or 62 days, which is 8 weeks and 3, 4, 5, or 6 days.
there are 560 days in 80 weeks
61