It depends on how deep the concrete. 600 sq ft at 6 inch deep is 300 cu ft = 11.1 yards. 12 inch deep is 22,2 yards; 4 inch deep is 5.5 yards
123.44 cubic yards
4 yards
55.56 cubic yards.
That'll depend on the size of the pool.
It depends on how deep the concrete. 600 sq ft at 6 inch deep is 300 cu ft = 11.1 yards. 12 inch deep is 22,2 yards; 4 inch deep is 5.5 yards
3,495.6 cubic yards.
If you use a standard 4-inch thickness you will need a minimum of 6.17 cubic yards.
14.8 yards
123.44 cubic yards
4 yards
How deep? 1 inch will take .7 yards
It is not possible to answer the question without knowing whether the patio is 11 ft x 10 ft or 11 yards *10 yards etc.
To find out how many yards of concrete you need for your 450 sq ft patio, you would first need to determine the thickness of the concrete you plan to pour. Let's assume a standard 4-inch thickness. One cubic yard of concrete would cover 81 square feet at a 4-inch depth. So for a 450 sq ft patio at 4 inches thick, you would need approximately 5.56 cubic yards of concrete.
55.56 cubic yards.
.99 yds
1.1852 cubic yards for every inch the pad is deep.