A yard of dirt is 3ft x 3ft x 3ft, or 27 cubic ft. The hole you need to fill is 8ft x 4ft x 1ft, or 32 cubic ft. You'll need 32/27th yards of dirt, or about 1.19 yards of dirt. Call it a yard and a half if you want to account for settling.
A yard is 27 cubic feet Youare covering 256 x 2/12 = 42.67 cu ft So you need 42.67/27 = 1.6 yards
Divide everything by 3.10x20x2/3= 400/3
1 ft = 1/3 yd → 1 cu ft = 1 ft × 1 ft × 1 ft = 1/3 yd × 1/3 yd × 1/3 yd = 1/23 cu yd So work out the volume of your hole by multiplying the dimensions together (ft × ft × ft) and divide the result by 27 to get the volume in cu yards, ie: volume in cubic yards = (ft × ft × ft) ÷ 27
6 cubic yards of dirt will cover 70 sq ft ... 2 ft 3 3/4 inches deep
6 sq. yds
You need 100 cubic yards for every 3-ft deep you want to spread it.
27 cubic feet = 1 cubic yardVolume = (14-ft x 14-ft x 1-ft) = 196 cubic feet = 7.26 cubic yards (rounded)
56,000 yds3
A yard is 27 cubic feet Youare covering 256 x 2/12 = 42.67 cu ft So you need 42.67/27 = 1.6 yards
32,266 CY
Divide everything by 3.10x20x2/3= 400/3
The volume of dirt to be hauled away is 85,000 cubic yards. Calculate the volume by converting the dimensions to yards (700 ft = 233.33 yd, 200 ft = 66.67 yd) then multiply the dimensions together (233.33 yd x 66.67 yd x 85 ft).
1 ft = 1/3 yd → 1 cu ft = 1 ft × 1 ft × 1 ft = 1/3 yd × 1/3 yd × 1/3 yd = 1/23 cu yd So work out the volume of your hole by multiplying the dimensions together (ft × ft × ft) and divide the result by 27 to get the volume in cu yards, ie: volume in cubic yards = (ft × ft × ft) ÷ 27
6 cubic yards of dirt will cover 70 sq ft ... 2 ft 3 3/4 inches deep
6 sq. yds
16 ft * 47 ft * 4 inches =16/3 yards * 47/3 yards * 4/36 yards = 9.3 yards approx.
(3,600 square ft) x (1 ft) = 3,600 cubic ft.1 cubic yard = 27 cubic ft3,600 cubic ft = 3,600/27 = (133 and 1/3) cubic yards