A yard of dirt is 3ft x 3ft x 3ft, or 27 cubic ft. The hole you need to fill is 8ft x 4ft x 1ft, or 32 cubic ft. You'll need 32/27th yards of dirt, or about 1.19 yards of dirt. Call it a yard and a half if you want to account for settling.
A yard is 27 cubic feet Youare covering 256 x 2/12 = 42.67 cu ft So you need 42.67/27 = 1.6 yards
Divide everything by 3.10x20x2/3= 400/3
To calculate the volume of dirt needed to fill the trench, first determine the volume in cubic feet: (200 \text{ ft} \times 2 \text{ ft} \times 2 \text{ ft} = 800 \text{ cubic feet}). To convert cubic feet to cubic yards, divide by 27 (since there are 27 cubic feet in a cubic yard): (800 \div 27 \approx 29.63). Therefore, it will take approximately 29.63 cubic yards of dirt to fill the trench.
1 ft = 1/3 yd → 1 cu ft = 1 ft × 1 ft × 1 ft = 1/3 yd × 1/3 yd × 1/3 yd = 1/23 cu yd So work out the volume of your hole by multiplying the dimensions together (ft × ft × ft) and divide the result by 27 to get the volume in cu yards, ie: volume in cubic yards = (ft × ft × ft) ÷ 27
6 cubic yards of dirt will cover 70 sq ft ... 2 ft 3 3/4 inches deep
You need 100 cubic yards for every 3-ft deep you want to spread it.
27 cubic feet = 1 cubic yardVolume = (14-ft x 14-ft x 1-ft) = 196 cubic feet = 7.26 cubic yards (rounded)
56,000 yds3
A yard is 27 cubic feet Youare covering 256 x 2/12 = 42.67 cu ft So you need 42.67/27 = 1.6 yards
32,266 CY
Divide everything by 3.10x20x2/3= 400/3
To calculate the volume of dirt needed to fill the trench, first determine the volume in cubic feet: (200 \text{ ft} \times 2 \text{ ft} \times 2 \text{ ft} = 800 \text{ cubic feet}). To convert cubic feet to cubic yards, divide by 27 (since there are 27 cubic feet in a cubic yard): (800 \div 27 \approx 29.63). Therefore, it will take approximately 29.63 cubic yards of dirt to fill the trench.
The volume of dirt to be hauled away is 85,000 cubic yards. Calculate the volume by converting the dimensions to yards (700 ft = 233.33 yd, 200 ft = 66.67 yd) then multiply the dimensions together (233.33 yd x 66.67 yd x 85 ft).
1 ft = 1/3 yd → 1 cu ft = 1 ft × 1 ft × 1 ft = 1/3 yd × 1/3 yd × 1/3 yd = 1/23 cu yd So work out the volume of your hole by multiplying the dimensions together (ft × ft × ft) and divide the result by 27 to get the volume in cu yards, ie: volume in cubic yards = (ft × ft × ft) ÷ 27
6 cubic yards of dirt will cover 70 sq ft ... 2 ft 3 3/4 inches deep
6 sq. yds
To calculate the volume of a hole that is 6 feet long, 6 feet wide, and 6 feet deep, you multiply the dimensions: 6 ft x 6 ft x 6 ft = 216 cubic feet. Since there are 27 cubic feet in a cubic yard, you divide 216 by 27, resulting in 8 cubic yards of dirt needed to fill the hole.