A yard of dirt is 3ft x 3ft x 3ft, or 27 cubic ft. The hole you need to fill is 8ft x 4ft x 1ft, or 32 cubic ft. You'll need 32/27th yards of dirt, or about 1.19 yards of dirt. Call it a yard and a half if you want to account for settling.
A yard is 27 cubic feet Youare covering 256 x 2/12 = 42.67 cu ft So you need 42.67/27 = 1.6 yards
Divide everything by 3.10x20x2/3= 400/3
To calculate the volume of dirt needed to fill the trench, first determine the volume in cubic feet: (200 \text{ ft} \times 2 \text{ ft} \times 2 \text{ ft} = 800 \text{ cubic feet}). To convert cubic feet to cubic yards, divide by 27 (since there are 27 cubic feet in a cubic yard): (800 \div 27 \approx 29.63). Therefore, it will take approximately 29.63 cubic yards of dirt to fill the trench.
1 ft = 1/3 yd → 1 cu ft = 1 ft × 1 ft × 1 ft = 1/3 yd × 1/3 yd × 1/3 yd = 1/23 cu yd So work out the volume of your hole by multiplying the dimensions together (ft × ft × ft) and divide the result by 27 to get the volume in cu yards, ie: volume in cubic yards = (ft × ft × ft) ÷ 27
6 cubic yards of dirt will cover 70 sq ft ... 2 ft 3 3/4 inches deep
You need 100 cubic yards for every 3-ft deep you want to spread it.
27 cubic feet = 1 cubic yardVolume = (14-ft x 14-ft x 1-ft) = 196 cubic feet = 7.26 cubic yards (rounded)
56,000 yds3
A yard is 27 cubic feet Youare covering 256 x 2/12 = 42.67 cu ft So you need 42.67/27 = 1.6 yards
32,266 CY
Divide everything by 3.10x20x2/3= 400/3
The volume of dirt to be hauled away is 85,000 cubic yards. Calculate the volume by converting the dimensions to yards (700 ft = 233.33 yd, 200 ft = 66.67 yd) then multiply the dimensions together (233.33 yd x 66.67 yd x 85 ft).
1 ft = 1/3 yd → 1 cu ft = 1 ft × 1 ft × 1 ft = 1/3 yd × 1/3 yd × 1/3 yd = 1/23 cu yd So work out the volume of your hole by multiplying the dimensions together (ft × ft × ft) and divide the result by 27 to get the volume in cu yards, ie: volume in cubic yards = (ft × ft × ft) ÷ 27
6 cubic yards of dirt will cover 70 sq ft ... 2 ft 3 3/4 inches deep
6 sq. yds
To calculate the volume of a hole that is 6 feet long, 6 feet wide, and 6 feet deep, you multiply the dimensions: 6 ft x 6 ft x 6 ft = 216 cubic feet. Since there are 27 cubic feet in a cubic yard, you divide 216 by 27, resulting in 8 cubic yards of dirt needed to fill the hole.
16 ft * 47 ft * 4 inches =16/3 yards * 47/3 yards * 4/36 yards = 9.3 yards approx.