We need to know the dimensions of the tube. The diameter AND the length of the tube. It takes o.465 yards per foot of length for a tube 4 feet in diameter. .
A yard (of dirt or concrete) is a volume of 1 cubic yard (1 yd)³, as the cubic is assumed in this context. Assuming a circle 7 feet across (diameter), then the radius is 3.5 feet = 1.16667 yards, and 8 inches = 0.2222 yards. So the volume of this is about 0.95 cubic yards. In concrete jargon it would be 0.95 yards.
It depends upon how thick you want the concrete. For example, if you want the concrete to be 6 inches thick, then you will need 200 cubic feet. There are 27 cubic feet per cubic yard; so divide the 200 cubic feet by 27 to get 7.4 cubic yards.
You cannot "fill" a cubic measurement with a square measurement.I think you meant cubic yards.1 cubic yard = 27 cubic feet.Your concrete slab is 1600 x 4/12 cubic feet = 533.333333... cubic feet.533.333333... cubic feet / 27 = 19.753 cubic yards (rounded to third decimal).
4.093 cubic yards
We need to know the dimensions of the tube. The diameter AND the length of the tube. It takes o.465 yards per foot of length for a tube 4 feet in diameter. .
A yard (of dirt or concrete) is a volume of 1 cubic yard (1 yd)³, as the cubic is assumed in this context. Assuming a circle 7 feet across (diameter), then the radius is 3.5 feet = 1.16667 yards, and 8 inches = 0.2222 yards. So the volume of this is about 0.95 cubic yards. In concrete jargon it would be 0.95 yards.
42 cubic feet or 1.56 yards.
It depends upon how thick you want the concrete. For example, if you want the concrete to be 6 inches thick, then you will need 200 cubic feet. There are 27 cubic feet per cubic yard; so divide the 200 cubic feet by 27 to get 7.4 cubic yards.
18.6240 yd³
1 "yard" of concrete is really 1 "cubic yard" = 27 cubic feet8 x 8 x 4 = 256 cubic feet = (256/27) = 9.48 cubic yards
.99 yds
1.2345 yards
You will need 1.31 cubic feet for a cylinder that is 3' wide x 5' tall.
You cannot "fill" a cubic measurement with a square measurement.I think you meant cubic yards.1 cubic yard = 27 cubic feet.Your concrete slab is 1600 x 4/12 cubic feet = 533.333333... cubic feet.533.333333... cubic feet / 27 = 19.753 cubic yards (rounded to third decimal).
At 4" thick you will need 1.23 cubic yards.
How deep? 1 inch will take .7 yards