The answer depends on the depth of the concrete. With a microscopically thin layer, you could probably get away with 1 [cubic] yard. On the other hand, a concrete pile that is several hundred feet high - will require a few(!) more yards.
700 square feet = about 77.8 square yards. (77.7777778 square yards)
77.77 square yards.
77.77 square yards.
700 sq feet = 77.8 sq yards.
9 square feet = 1 square yard 700 square feet = 777/9 square yards
700 square feet = about 77.8 square yards. (77.7777778 square yards)
77.77 square yards.
77.77 square yards.
Oh, dude, you're hitting me with some math now? Okay, so 700 square feet is like the area of a room or something. To find out how many yards that is, you gotta remember that 1 yard is 3 feet. So, 700 square feet is about 77.78 yards. But like, who's measuring their living room in yards anyway?
700 sq feet = 77.8 sq yards.
About 585.3 m2 = 700 yd2
9 square feet = 1 square yard 700 square feet = 777/9 square yards
1 cubic yard = 27 cubic feet700 square feet x 1/2 foot = 350 cubic feet = 1226/27 cubic yards(12.963 cubic yards, rounded)
The answer depends on what on earth you mean by "square meetingws", or even square meetings.
585.29 square meters.
700 meters = 765.53 yards.
700 metres = 765.529 yards.