The answer depends on the depth of the concrete. With a microscopically thin layer, you could probably get away with 1 [cubic] yard. On the other hand, a concrete pile that is several hundred feet high - will require a few(!) more yards.
700 square feet = about 77.8 square yards. (77.7777778 square yards)
77.77 square yards.
77.77 square yards.
700 sq feet = 77.8 sq yards.
9 square feet = 1 square yard 700 square feet = 777/9 square yards
700 square feet = about 77.8 square yards. (77.7777778 square yards)
77.77 square yards.
77.77 square yards.
700 sq feet = 77.8 sq yards.
About 585.3 m2 = 700 yd2
9 square feet = 1 square yard 700 square feet = 777/9 square yards
Oh, dude, you're hitting me with some math now? Okay, so 700 square feet is like the area of a room or something. To find out how many yards that is, you gotta remember that 1 yard is 3 feet. So, 700 square feet is about 77.78 yards. But like, who's measuring their living room in yards anyway?
1 cubic yard = 27 cubic feet700 square feet x 1/2 foot = 350 cubic feet = 1226/27 cubic yards(12.963 cubic yards, rounded)
585.29 square meters.
The answer depends on what on earth you mean by "square meetingws", or even square meetings.
700 metres = 765.529 yards.
700 meters = 765.53 yards.