How many square yards in a 20x18 feet 3 inches thick
4.074 cubic yards for every foot the slab is thick.
To calculate the weight of concrete per square foot at a thickness of 4 inches, you first need to know that concrete weighs approximately 150 pounds per cubic foot. A 4-inch thickness is one-third of a foot, so you multiply 150 pounds by 1/3, resulting in about 50 pounds per square foot. Therefore, 1 square foot of concrete that is 4 inches thick weighs approximately 50 pounds.
1 cubic yard = 27 cubic feet700 square feet x 1/2 foot = 350 cubic feet = 1226/27 cubic yards(12.963 cubic yards, rounded)
Total coverage area 314.16 sq. feet. depth of 2 inches = 1.94 cu yards answer ... around 2 cu yards
15 yards 1 foot 6 inches is the same as 14 yards 3 feet 18 inches. If you subtract 4 yards 2 feet 8 inches from that measure, you get 10 yards, 1 foot, 10 inches.
18x32 feet by 4 inches thick: 7.1 cubic yards. For a 6-inch slab, 10.7 cubic yards.
A 9x9 foot slab 4 inches thick requires a minimum of 1 cubic yard. If you go to 6 inches thick you will need 1.5 cubic yards.
4.074 cubic yards for every foot the slab is thick.
A minimum of 1.3 cubic yards.
It depends on the concrete company you're working with. You need 33 yards of concrete. Concrete companies deliver the stuff in full truckloads - and no, this is NOT a job for Sakrete. If you can find a company that has Oshkosh front-load mixers, you'll need three truckloads because those trucks hold 11 yards. If you can only find companies with rear-load mixers, you need 36 yards because a rear-load mixer holds 6 yards of concrete.
18 inches
Is the concrete filled with pebble or lightweight foam? This is really an impossible question. Not enough data.
1 cubic yard = 27 cubic feet700 square feet x 1/2 foot = 350 cubic feet = 1226/27 cubic yards(12.963 cubic yards, rounded)
A 12 foot by 12 foot slab would be 3.5 inches thick. It would total 1.555555 yards mathematically. It is recommended to add 5% error to the mix and round up to the nearest half yard. If you order this then order 2 yards and expect overage.
You will need a minimum of 2.42 cubic yards of cement.
To calculate the amount of concrete needed for a 900 square foot area, you first need to determine the thickness of the concrete slab. Once you have the thickness in inches, divide it by 36 to convert to yards. Then divide the total cubic yards by the number of cubic yards in a concrete truck to determine how many truckloads you need.
10.00 dollars per square foot plus permit cost.