1461 days
Multiply 1461 by 5. 5 x 4 = 20. (Don't forget the leap years.)
There are 1461 days in a year (inclu. leap year) or 1460 (without leap year)
Given a span of four years includes three normal years and one leap year, 4 years consists of (365 x 3) + 366 = 1461 days.
365.25/7=1461/28 therefore 1461/28*1000=52,178 sundays there will be in a thousand years
1461
1461 days
Exactly 48 months. The period 1461 days is exactly 4 years (three years and one leap year). In this case, you do not have to use the average for days in a month (30.4 days).
Multiply 1461 by 5. 5 x 4 = 20. (Don't forget the leap years.)
365.25*4 is 1461 days.
There are 1461 days in a year (inclu. leap year) or 1460 (without leap year)
Given a span of four years includes three normal years and one leap year, 4 years consists of (365 x 3) + 366 = 1461 days.
In any given stretch of four years, there are three normal years and one leap year. Therefore, 4 years is equal to (365 x 3) + 366 = 1461 days.
365.25/7=1461/28 therefore 1461/28*1000=52,178 sundays there will be in a thousand years
About 208 as 52 weeks on average, and times 4 = 208 In 4 years there are 365 + 365 + 365 + 366 days = 1461 days, then divide by 7 = 208.714
1461 days (because one of those years will be a leap year with 366 days, rather than 365)17,532 hours 1,051,920 minutes 63,115,200 seconds
1461 in most cases, but 1460 if the 4-year sequence contains a year that is divisible by 100 but not by 400.