Just multiply the numbers together. 4 X 55 X 4 (assuming they are all feet).
= 4080 cubic feet.
Now, 27 cubic feet per cubic yard so 4080/27 = 151.1 cu yds.
But if the last number in the problem was 4 inches (not feet) then the above answer is 12 times too much. [and 4 inches is a fair thickness for a path or drive] so 151.1/12 = 12.59 cu yards.
Chat with our AI personalities
No. 36x36x36 is the cubic inches in a cubic yard. 46656 cubic inches equal a cubic yard.
To determine how many bags of sand are needed to make 1 cubic yard, you first need to know the size of the sand bag. A standard bag of sand typically contains 0.5 cubic feet. Since there are 27 cubic feet in a cubic yard, you would need 54 bags of sand (27 cubic feet divided by 0.5 cubic feet per bag) to make 1 cubic yard.
There are no cubes in a yard. There are 3x3x3=27 cubic feet in a cubic yard.
1 cubic yard of what?
To calculate the number of 5-gallon buckets of gravel in a cubic yard, we need to first determine the volume of a cubic yard. A cubic yard is equal to 27 cubic feet. Since there are 7.48 gallons in a cubic foot, a cubic yard is equivalent to 201.96 gallons. Therefore, there are approximately 40.39 (201.96 divided by 5) 5-gallon buckets of gravel in a cubic yard.