2800 feet of gravel
A rectangle area that is 12 feet by 14 feet by 6 inches deep is equal to 3.11 cubic yards. This job would require 4.2 tons of gravel.
It depends on the volume of the bag and how deep you want the gravel to be.
about 71 cubic metres of gravel i think
Depends on what depth you want to spread the gravel at. This answer depends on knowing the cubic capacity of 50 lbs. of gravel.
the think walls protected the ditch in aurangzebs time because the walls were thick and the ditch ( pit ) was deep. this protected the ditch : as if the aurangzebs come from the ditch, they would fall down and if they came from the other side, the soldiers would see them from the bastions. I know this because i have the book of history and it has the chapter of aurangzeb. good luck .
A deep ditch carved over time by running water is called a ravine.
You would need about 13 cu yards or about 15 tons.
The men dug a deep ditch to lay pipes for the new septic tank. I fell in the ditch, but luckily it was dry.
It varies, but it is usually 50 feet deep in most places.
A long, narrow deep ditch.
2800 feet of gravel
A rectangle area that is 12 feet by 14 feet by 6 inches deep is equal to 3.11 cubic yards. This job would require 4.2 tons of gravel.
It is a gorge.
A trench is a deep ditch sometimes surrounding a fortification.
The gravel base for a shed should typically be around 4 to 6 inches deep to provide proper support and drainage.
It depends how deep you want the gravel to cover, if you want it to be 2 inches deep it's going to cost more than 5 inches. Also it depends how big the gravel is cut, I think that the smaller the gravel is the more it costs.