The amount of plaster needed to cover a square meter typically depends on the thickness of the application. Generally, for a standard layer of plaster, you would require about 1.5 to 2 kilograms of plaster per square meter for a thickness of around 10 mm. However, this can vary based on the type of plaster and the surface being covered, so it's always best to consult manufacturer guidelines for specific products.
To cover a 1 square meter area with 5-centimeter squares, first convert the area to square centimeters: 1 square meter = 10,000 square centimeters. Each 5-centimeter square has an area of 25 square centimeters (5 cm x 5 cm). Dividing 10,000 square centimeters by 25 square centimeters per square gives 400 squares needed to cover the 1 square meter area without overlapping.
10,000 of them.
The quantity of neeru (a type of fine aggregate used in plastering) required for 1 square meter of plaster depends on the thickness of the plaster layer and the mix ratio. Generally, for a typical plaster thickness of about 12-15 mm, approximately 0.03 to 0.05 cubic meters of neeru may be needed per square meter. It's essential to consider the specific mix design and project requirements for accurate calculations.
about 10.5 square feet
The number of tiles needed to cover one square meter depends on the size of the tiles. For instance, if you have 20 cm x 20 cm tiles, you would need 25 tiles to cover one square meter, as each tile covers 0.04 square meters. To determine the exact number for different tile sizes, divide 1 square meter (1,000,000 square mm) by the area of one tile (in square mm).
12 x 4 = 48 square metres.
10,000 of them.
about 10.5 square feet
You can not build a wall out of plaster, you need bricks/blocks/stone and cement to build a wall.
2500 tiles
100 mmm = 0.100 meter 28 x .1 = 2.8 cubic meters
One square metre is the area of a square whose sides measure exactly one metre.
To calculate the number of paving slabs needed for one square meter, first determine the area of one slab. A slab measuring 600mm x 300mm has an area of 0.6m x 0.3m = 0.18 square meters. Therefore, to cover one square meter, you would need approximately 1 / 0.18 = 5.56 slabs. Rounding up, you would need 6 slabs to cover one square meter.
83m^2
That depends on how thin you spread it. If it's a meter thick, it only covers one square meter. If it's a centimeter thick, it covers a hundred square meters.
One cubic meter cannot be "converted" to a square measure unless we know how "deep" it is being spread. For example, if it is one meter deep, then it would cover one square meter; but if it is two meters deep, then it would cover half that area. If it were, say, 1 cm deep, then it could cover a million square centimeters (100 x 100 x 100).
the size of you!>!CK