Want this question answered?
Work = 500 x 3 = 1,500 joulesPower = (work/time) = 1,500/5 = 300 watts = about 0.4 horsepower (rounded)
To work out the answer divide 500 by 25. Like this 500 / 25 = 20. So it takes 20 x 25 to get to 500.
500 x (1.0810) = 1079.46 give or take...
230 divided by 500 showing your work = 0.46
250,000
To find the time taken to perform 500 joules of work at a power of 25 watts, you divide the work by the power. In this case, 500 Joules / 25 watts = 20 seconds. Therefore, it would take 20 seconds to perform 500 Joules of work with 25 watts of power.
The work done is equal to the power multiplied by the time. In this case, 500 watts × 2 minutes = 1000 joules.
Alot of power 500+ hp
500 W power
The work done by an electric mixer can be calculated by multiplying the power (500 watts) by the time (2.50 minutes) in seconds. First, convert the time to seconds: 2.50 minutes = 150 seconds. Then, calculate the work done: Work = Power x Time = 500 watts x 150 seconds = 75,000 joules.
The power needed to lift a 2000N object in 4.0s can be calculated using the formula: Power = Work / Time. First, calculate the work done, which is Work = force x distance. Assuming distance is 1 meter (for simplicity), Work = 2000N x 1m = 2000 Joules. Then, Power = 2000J / 4s = 500 Watts. Therefore, 500 Watts of power is needed to lift a 2000N object in 4.0s.
Work = 500 x 3 = 1,500 joulesPower = (work/time) = 1,500/5 = 300 watts = about 0.4 horsepower (rounded)
It has 500 hp.
about 500
how much r134 does a ford 500 take
385hp
it costs about €500