420 cubic feet
You will need about 8 trucks of lime rock.
you need 3,072 cubic feet of soil
You will need 200 cubic feet.
Your cieling appears to be a volume rather than an area. This is confusing. 408 inches.
Just multiply 1/2 foot x 12,000 square feet. The answer will be in cubic feet.
You will need about 8 trucks of lime rock.
This question is about a cubed area. First convert the inches to feet--18 inches is 1.5 feet. Then multiply all three numbers by each other. 15*12*1.5 is 270. You will need 270 cubed feet of dirt to fill the area.
102 feet is a measurment of length, square feet is a measurement of area, to work out the square feet of an area you need two measurments lenght and width.
you need 3,072 cubic feet of soil
You will need 1500 cubic feet.
1 foot = 12 inches 20 ft * 7 ft can be expressed as 240 inches * 84 inches, then 240 in * 84 in * 2 in = 40320 inches cubed or 3360 cubic feet
The area remains the same, we jsut need to convert the square feet to inches.150 square feet * a converting factor between inches and feet = # of square inchesThe converting factor is an area = 12inches/ft*12inches/ft150 sq ft * 144 sq inches/sq feet= 21,600 square inches
To calculate the amount of soil needed, you multiply the area by the desired depth. In this case, you have 9300 square feet and want a depth of 12 inches. Convert the depth to feet (12 inches = 1 foot) and multiply: 9300 square feet x 1 foot = 9300 cubic feet of soil. So, you need 9300 cubic feet of soil to cover the area with a depth of 12 inches.
If you mean 12 feet long by 8 inches wide by 4 inches deep, you will need at least 0.1 cubic yards
You will need 200 cubic feet.
19.55
Your cieling appears to be a volume rather than an area. This is confusing. 408 inches.