630 cubic inches
Plan on about 2.2 cubic yards (2.8 tons) of gravel.
2.37 cubic yards of stone for every 3 inches deep it needs to be
3000 sq ft * 4 inches = 1000 cubic feet.
For 1 foot deep, 400 cu ft. For 3 inches deep, 100 cu ft.
It depends on the units used for measuring the tiles: 17x17 inches, centimetres etc.
to cover a deck this is 237.5 inches long and 141" on one side and 139" wide with netting this is sixty inches wide how much netting is needed
1 371.42857 US gallons or 5.19142188 cubic meters
You will need 1500 cubic feet.
It will take 29.55 sq feet to cover it.
2.37 cubic yards of stone for every 3 inches deep it needs to be
Plan on about 2.2 cubic yards (2.8 tons) of gravel.
3000 sq ft * 4 inches = 1000 cubic feet.
It depends on the units used for measuring the tiles: 17x17 inches, centimetres etc.
For 1 foot deep, 400 cu ft. For 3 inches deep, 100 cu ft.
2 inches = 1/6 foot Volume = 3,500/6 = 5831/3 cubic feet = 21.605 cubic yards
10
184 sq in