SMV is used to measure task or work content of a garment. This term is widely used by industrial engineers and production people in the garment manufacturing industry. For the estimation of cost of making a garment SAM value plays a very important role. In past scientists and apparel technicians did research on how much time to be allowed to do a job when one follows standard method during doing the job. According to the research study minute value has been defined for each movement needed to accomplish a job. Synthetic data is available for each movements.
General Sewing Data (GSD) has defined set of codes for motion data for SAM calculation. There is also other methods through which one can calculate SAM of a garment with out using synthetic data or GSD. In this article both methods are explained in the following.
Method #1: Calculation of SAM Using Synthetic DataIn this method 'Predetermined Time Standard' (PTS) code are used to establish 'Standard Time' of a garment or other sewing products.Step 1: Select one operation for which you want to calculate SAM.
Step 2: Study the motions of that operation. Stand by side of an operator (experienced one) and see the operator how he is doing it. Note all movement used by the operator in doing one complete cycle of work. See carefully again and recheck your note if all movement/motion are captured and correct. (for example motions are like - pick up parts one hand or two hand, align part on table or machine foot, realign plies, etc.)
Step 3: List down all motion sequentially. Refer the synthetic data for TMU (Time measuring unit) values. For synthetic data you can refer GSD (without licence use of GSD code prohibited but for personal use and study one can refer GSD code and TMU values) or Sewing Performance Data table (SPD). Now you got TMU value for one operation (for example say it is 400 TMU). Convert total TMU into minutes (1 TMU=0.0006 minute). This is called as Basic Time in minutes. In this example it is 0.24 minutes.
Step 4: Standard allowed minutes (SAM) = (Basic minute + Bundle allowances + machine and personal allowances). Add bundle allowances (10%) and machine and personal allowances (20%) to basic time. Now you got Standard Minute value (SMV) or SAM. SAM= (0.24+0.024+0.048) = 0.31 minutes.
I like to refer you an article Secret Behind Calculation of Machine Time in SAM for better understand of SAM calculation.
Method #2: Calculation of SAM Through Time StudyStep 1: Select one operation for which you want to calculate SAM.
Step 2: Take one stop watch. Stand by side of the operator. Capture cycle time for that operation. (cycle time - total time taken to do all works needed to complete one operation, i.e. time from pick up part of first piece to next pick up of the next piece). Do time study for consecutive five cycles. Discard if found abnormal time in any cycle. Calculate average of the 5 cycles. Time you got from time study is called cycle time. To convert this cycle time into basic time you have to multiply cycle time with operator performance rating. [Basic Time = Cycle Time X performance Rating]
Step 3: Performance rating. Now you have to rate the operator at what performance level he was doing the job seeing his movement and work speed. Suppose that operator performance rating is 80%. Suppose cycle time is 0.60 minutes. Basic time = (0.60 X 80%) = 0.48 minutes
Step 4: Standard allowed minutes (SAM) = (Basic minute + Bundle allowances + machine and personal allowances). Add bundle allowances (10%) and machine and personal allowances (20%) to basic time. Now you got Standard Minute value (SMV) or SAM. SAM= (0.48+0.048+0.096) = 0.624 minutes.
Assuming SMV is an acronym for Sake Meter Value (a translation of "nihonshu-do"), then you can calculate a SMV value from a specific gravity (SG) value using this formula:SMV = ((1/SG)−1) × 1443For example, a finished genshu sake with a SG of 0.996 (what my homemade sake typically finishes fermenting at) would have a nihonshu-do of +5.8.
• SMV means Standard Minute Value. • It is a numerical value which is represented the standard time of a process or operation in a standard environment for standard worker. • It will be calculated by the following formula (Stop-watch system): Standard Time = Basic Time + Allowance% There are many techniques which have been developed to establish standard minute Values, one such technique is Called Pro-SMV , Professional standard minute value, this is a system based on MTM 2 developed by Methods Apparel consultancy India Pvt Limited.
It is a value calculated from the sample values only.It is a value calculated from the sample values only.It is a value calculated from the sample values only.It is a value calculated from the sample values only.
In the metric system, lengths are calculated in meters.In the metric system, lengths are calculated in meters.In the metric system, lengths are calculated in meters.In the metric system, lengths are calculated in meters.
The precision of a calculated answer is limited by the least precise measurements used in the calculation.
Smv is a pre calculated time while sam is calculated during any operation evaluation. Tanveer Alvi
at 4shared.com
SMV is the main factor to be measured in any organization to ensure smooth and smart planning flow through the industry at any level. This should plan through proper Industrial Engineering patterns. SMV is named as Standard Minute Value. SMV is the time required to produce one unit or time required to complete a particular operation. But we must ensure that the SMV factor is based on 100%. So the practical SMV factor is based on the correspondence efficiency. The correspondence efficiency is based on the break even point of the business. This is the very important factor to be measured in any business environment to increase productivity. Just not the basic calculation of the SMV. So when calculating the SMV factor the most important factor is to calculate through the philosophy of MTM1 predetermined analyzing system based on Lean Manufacturing.
method of calculating either SAM and SMV will remain same as follow for the SAM, record 5 cycle of every operation of garment give rating add allowances. for SMV analyse codes (MMT2(GSD,Pro-Man etc.) and get SMV Once having Data base or experience then can put estimated SAM/SMV
smv
Yes
SMV would stand for the "Science Museum of Virginia". It was established in 1970 and is located at 2500 West Broad Street, Richmond, Virginia 23220.
Assuming SMV is an acronym for Sake Meter Value (a translation of "nihonshu-do"), then you can calculate a SMV value from a specific gravity (SG) value using this formula:SMV = ((1/SG)−1) × 1443For example, a finished genshu sake with a SG of 0.996 (what my homemade sake typically finishes fermenting at) would have a nihonshu-do of +5.8.
.smv format
It's .smv
The airport code for Samedan Airport is SMV.
Pls use the GSD package or ASD package