To calculate variance, (population standard deviation squared), usually written as σ2, first find the mean.
In this case, ( 3 + 5 + 6 + 4 + 7 + 7 +8 ) / 7 = 40/7 ≈ 5.7143
Then find the difference between every number and the mean.
5.7143 - 3 = 2.7143
5.7143 - 5 = 0.7143
5.7143 - 6 = -0.2857
5.7143 - 4 = 1.7143
5.7143 - 7 = -1.2857
5.7143 - 7 = -1.2857
5.7143 - 8 = -2.2857
Then square all of the differences.
7.3674
0.5102
0.0816
2.9388
1.6530
1.6530
5.2244
Then add the products together.
19.4284
Then divide by the number of numbers in the set of data (7) for the variance.
σ2 ≈ 2.78
Since you are using the entire population, you use the population standard deviation instead of the sample standard deviation.
In statistics, you are more likely to see sample standard deviation, but since there are only seven numbers in the data set, we use the population standard deviation.
Chat with our AI personalities
var=4
The variance is 27.0
The variance for 3 5 12 3 2 is: 16.5
There are 7 variances associated with a budget ( which are generally calculated for controlling purposes) 1- Material Price variance 2- Material Quantity variance 3- Labor rate variance 4- Labor efficiency variance 5- Spending variance 6- Efficiency variance 7- Capacity variance
The variance of 5 9 8 9 9 = 3