Productivity
Chat with our AI personalities
The average construction labor cost per hour is around 30 dollars an hour. This is what a qualified and seasoned worker makes.
In each hour the sawmill produces 500 ÷ 50 = 10 bundles. Each hour the forklift can load 10 bundles which is the output of the sawmill in an hour. Therefore it will take 3 × 4 hours = 12 hours to load all the output.
This has no physical meaning. The correct unit for power is the watt (not watt per hour).
At fedex freight i started out at $15.56 an hour and after 1 year I am making $17.84 an hour at the des plaines, IL location
The average labor cost per hour in Chile will be 19$