If the points are: (4, 8) and (2, 4)
Then the slope is: 8-4/4-2 = 4/2 = 2
For example of the points: (4, 5) and (7, 9) Slope: (5-9)/(4-7) = (-4)/(-3) = 4/3
There are a few steps to rewriting expressions. The steps of rewriting expressions are finding the value of the letter and then using the common factor.
A series of steps built in a slope is commonly referred to as a terraced or stepped slope. This design is used to reduce soil erosion, manage water runoff, and create flat areas for agriculture or landscaping on hilly terrain. Each step or terrace provides a level platform, allowing for better cultivation and easier access to different elevations. Terracing is often seen in agricultural practices, especially in mountainous regions.
The prime factors of 42 are 2, 3 and 7
the square root of 9 is 3 so 1 +3 = 4
u have to go in aline 10 steps
flattening of slope is generally a method of cutting the hill slope in the shape of steps. these steps being horizontal instead of slopey is better to check erosion.
what steps can be followed for finding a misplaced paper medical record
As you go from reading the given information to knowing the slope of the line, just write down each thing you do.
Terrace farming is practiced of the slope of a mountain. Fields are cut and filled so they resemble steps. These steps slow the flow of water down the slope preventing erosion. This is a common practice in mountainous regions such as Asia and South America.
For example of the points: (4, 5) and (7, 9) Slope: (5-9)/(4-7) = (-4)/(-3) = 4/3
For example of the points: (4, 5) and (7, 9) Slope: (5-9)/(4-7) = (-4)/(-3) = 4/3
Hug
There are a few steps to rewriting expressions. The steps of rewriting expressions are finding the value of the letter and then using the common factor.
To build flagstone steps on a slope, first, dig out the area for the steps and create a level base. Place the flagstones on the base, starting from the bottom and working your way up. Use a level to ensure each step is flat and stable. Fill in the gaps between the flagstones with gravel or sand to secure them in place.
You need a tripple beam balance
1) eroding down 2)weathering 3)slope transport