Labor cost variance means the difference between standard labor cost and actual labor cost.

User Avatar

Wiki User

10y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: What do you mean by labor cost variance?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Continue Learning about Math & Arithmetic

What factors causes Budget Variance?

There are 7 variances associated with a budget ( which are generally calculated for controlling purposes) 1- Material Price variance 2- Material Quantity variance 3- Labor rate variance 4- Labor efficiency variance 5- Spending variance 6- Efficiency variance 7- Capacity variance


What is variance?

In most production management systems, a "Planned" quantity and material cost is calculated based on the associated Bill of Materials (BOM) and Operatons being performed (Route) creating labor and overhead related costs. The "Actual" quantities, material costs, and labor/overhead costs are issued to a Work in Process (WIP) account and the quantities/values of the produced items are recieved from the WIP account. A variance usually occurs when there is a difference between the issued material cost plus labor and overhead and the recieved material cost of the produced item. The reasons for these variances can be differences in planned vs actual quantities, differences in system or planned cost of materials, labor, or overhead vs actual cost, or any other potential reason for an unplanned difference.


When a coin is tossed four time then mean and variance of the number of the head?

Mean = 2. Variance = 1.


Fixed-overhead budget variance?

Fixed overhead budgeted variance is the difference between estimated budgeted cost and actual fixed overhead cost of production.


Is variance based on deviations from the mean?

Variance is the squared deviation from the mean. (X bar - X data)^2

Related questions

What does an unfavorable direct labor price variance indicate?

Unfavorrable direct labor price variance indicates that business has incurred more direct labor cost for production of units of product then standard labor cost. For example if standard cost of direct labor for producing 1 unit is 10 and company incurred 105 for making 10 units then extra 5 is unfavorable direct labor cost variance.


What is direct labor variance?

It means the difference between the budgeted or estimated direct labour cost at the start of work activity with the actual direct labour cost at the end of activity or fiscal year. If budgeted cost is more then the actuall then it is favourable variance otherwise it is unfavourable direct labour cost variance


What is the difference between variable overheads cost variance andfixed overheads cost variance?

Variable overhead cost variance is that variance which is in variable overheads costs between the standard cost and the actual variable cost WHILE fixed overheads cost variance is variance between standard fixed overhead cost and actual fixed overhead cost.


What factors causes Budget Variance?

There are 7 variances associated with a budget ( which are generally calculated for controlling purposes) 1- Material Price variance 2- Material Quantity variance 3- Labor rate variance 4- Labor efficiency variance 5- Spending variance 6- Efficiency variance 7- Capacity variance


What is favourable variance?

A favorable variance is the difference between the budgeted or standard cost and the actual cost. If the actual cost is less than budgeted or standard cost, it is a favorable variance.


What is One potential cause of Total Manufacturing Overhead Variance?

If the estimated materials, labor or overhead costs allocated for a manufacturing order is different from the actual cost of the MO then the potential result is a Manufacturing Overhead Variance.


What is cost variance?

Cost variance means the difference in actual cost from standard cost and very important part of standard costing and budgeting analysis.


Will the direct labor price variance always be unfavorable if more hours are worked than the standard hours allowed for the actual output attained?

No, Direct labor price variance is created due to difference in standard labor rate and actual labor rate for example standard labor rate per unit is 10 and actual labor rate is 11 then 1 per unit is unfavourable direct labor price variance.


What is the difference between negative price variance and volume variance?

Negative price variance is when the cost is less than budgeted. Volume variance is a variance in the volume produce.


What does labor costs mean?

Labor cost means the direct labor cost incurred by business to manufacture units of products to be sold.


What is variance?

In most production management systems, a "Planned" quantity and material cost is calculated based on the associated Bill of Materials (BOM) and Operatons being performed (Route) creating labor and overhead related costs. The "Actual" quantities, material costs, and labor/overhead costs are issued to a Work in Process (WIP) account and the quantities/values of the produced items are recieved from the WIP account. A variance usually occurs when there is a difference between the issued material cost plus labor and overhead and the recieved material cost of the produced item. The reasons for these variances can be differences in planned vs actual quantities, differences in system or planned cost of materials, labor, or overhead vs actual cost, or any other potential reason for an unplanned difference.


The variance which measures the deviation of the rate actually paid to labor as from the standard hourly rate is known as?

Labour rate variance .