3 yard * 3 ft = 3 yd * 1 yd = 3 sq yd or 9 ft * 3 ft = 27 sq ft
1 yd is 3 feet.27 feet is way bigger!
27 ft + 3 yds =27 ft + (3*3 ft) =27 ft + 9 ft =36 fth
3x9 is 27 so its 27 feet.
1 ft = 1/3 yd → 1 cu ft = 1 ft × 1 ft × 1 ft = 1/3 yd × 1/3 yd × 1/3 yd = 1/23 cu yd So work out the volume of your hole by multiplying the dimensions together (ft × ft × ft) and divide the result by 27 to get the volume in cu yards, ie: volume in cubic yards = (ft × ft × ft) ÷ 27
9 yd, algebraic steps below: 27 ft*1 yd 3 ft=9 yd
1 yd = 3 ft9 yd = (9 x 3) = 27 ft9 yd + 2 ft = 27 ft + 2 ft = 29 ft
27 ft
3 yard * 3 ft = 3 yd * 1 yd = 3 sq yd or 9 ft * 3 ft = 27 sq ft
Assuming by "yard" you mean a "builder's" yard = 1 cubic yard: 1 yd = 3 ft 1 cu yd = 1 yd x 1 yd x 1 yd = 3 ft x 3 ft x 3 ft = 27 cu ft. 1ft x 200 ft x 200 ft = 40000 cu ft → 40000 cu ft = 40000 ÷ 27 cu yd = 1481 13/27 cu yd ≈ 1481.5 cu yd.
9
1 yd = 3 ft 27 ft = 9 yd
1 yd is 3 feet.27 feet is way bigger!
3 yd = 1 ft → volume = 120 ft × 40 ft × 1 ft = (120 ÷ 3) yd × (40 ÷ 3) yd × (1 ÷ 3) yd = 4800 ÷ 27 yd³ = 177 7/9 cu yd ≈ 177.78 cubic yards.
27 ft + 3 yds =27 ft + (3*3 ft) =27 ft + 9 ft =36 fth
3x9 is 27 so its 27 feet.
1 ft = 1/3 yd → 1 cu ft = 1 ft × 1 ft × 1 ft = 1/3 yd × 1/3 yd × 1/3 yd = 1/23 cu yd So work out the volume of your hole by multiplying the dimensions together (ft × ft × ft) and divide the result by 27 to get the volume in cu yards, ie: volume in cubic yards = (ft × ft × ft) ÷ 27