30 * 12 = 360
30
multiply before adding. 30+(30*0)+1so 30+0+1 is 31
3 + 6 + 9 + 12 = 30
It depends on which months, but there are 30 and 5/12 days on average to 6 multiplied by that is 2190/12 =182.5 An easier way to asnwer this is to say 365 days in a year and 6 months is half a year so there are 365/2 days which is also 182.5
30 * 12 = 360
30
365 days (366 days; leap year) (1 year).
multiply before adding. 30+(30*0)+1so 30+0+1 is 31
That depends what the value of a is.
as of March 19 March has 31 days - 19 = 12 April has 30 days = 30 May 12 = 12 12 + 30 + 12 = 54 days
3 + 6 + 9 + 12 = 30
20 + 12 + 32 + 20 + 30 + 72 = 186
-6
61+24=85
The LCM of 12 and 30 is 60.
It depends on which months, but there are 30 and 5/12 days on average to 6 multiplied by that is 2190/12 =182.5 An easier way to asnwer this is to say 365 days in a year and 6 months is half a year so there are 365/2 days which is also 182.5