you can't have 42 days in a week theirs only seven
There are 42 days in six weeks.
42 days. 7 days x 6 weeks = 42 days.
There are 6 weeks in 42 days. This calculation is based on the fact that there are 7 days in a week. By dividing 42 days by 7 days per week, we get a total of 6 weeks.
42 weeks and 6 days.
Six weeks is equal to 42 days, as each week consists of 7 days (6 weeks x 7 days/week = 42 days).
There are 42 days in six weeks.
42 days. 7 days x 6 weeks = 42 days.
There are 6 weeks in 42 days. This calculation is based on the fact that there are 7 days in a week. By dividing 42 days by 7 days per week, we get a total of 6 weeks.
Six weeks is 42 days (6X7).
There are 42 days in six weeks, since there are seven days in a week. 7x6=42.
42 days
There are 7 days in a week, so 7 days per week x 6 weeks = 42
42 weeks and 6 days.
To determine the date that was 42 weeks ago, you can subtract 42 weeks from today's date. Since there are 7 days in a week, 42 weeks equals 294 days. If today is October 2, 2023, then 294 days ago was December 11, 2022.
Six weeks is equal to 42 days, as each week consists of 7 days (6 weeks x 7 days/week = 42 days).
There are 299/7 = 42 weeks and 5 days
six.