answersLogoWhite

0

A rectangle 60 inches by 40 inches has an area of 2,400 square inches.

User Avatar

Wiki User

15y ago

What else can I help you with?

Related Questions

What is the slope if the base is 60 inches wide and 40 inches high?

Slope = Height/Base = 40/60 = 2/3


What is the perimeter of a table that is sixty inches long and forty-eight inches wide?

60"+60"+40"+40"=200" 60"=5' 200"=16'8" 60"+60"+48"+48"=216" 60"=5' 48"=4' perimeter=216" or 18'


How many squre feet are in 40 by 60?

If that's 40 x 60 feet, it's 2400 square feet. If that's 40 x 60 inches, it's 16 and 2/3 square feet.


Can i send a copy of painting to you help determine value?

40 by 60 inches


60 inches by 96 inches equals how many square feet?

12 inches = 1 foot 60 inches = (60 / 12) = 5 ft 96 inches = (96 / 12) = 8 ft (5 ft x 8 ft) = 40 square feet


What is the height of a rectangle if the area is 60 inches and the base is 20?

40 inches no. that is not right your area is 60 square inches; watch your units area = base x height height = area / base height = 60/20 = 3 inch


What is the average rainfall in Arkansas by season?

2.17 feet per year 2.17 feet per year 2.17 feet per year


60cm is how many inches?

There are 2.54 centimeters in one inch. Therefore to get amount of inches in centimeters, value in centimeters has to be divided by amount of centimeters in one inch: 60 centimeters = [centimeters] / 2.54 = 60 / 2.54 = 23.622 inches


On flat bed trailer 40 foot load What is the max height allowed?

60 inches


What is 60 inches x 8 feet in square feet?

First, get them into the same units: 60 inches = 5 feet. 5 feet x 8 feet = 40 square feet.


What is the largest size of poster board available?

The largest size of poster board available is typically around 40 inches by 60 inches.


40' X 60' x4 how much concrete?

To calculate the amount of concrete needed for a 40' x 60' area with a thickness of 4 inches, first convert the thickness to feet: 4 inches is 1/3 of a foot. Then, calculate the volume: 40' x 60' x (1/3)' = 800 cubic feet. Therefore, you will need 800 cubic feet of concrete.