The term "Prime Cost Sum" shall mean a sum provided for work or services to be executed by a Nominated Sub-contractor or for material s or goods to be obtained from a Nominated Supplier. Such sum shall be deemed to be exclusive of any profit or attendance required by the Contractor and provision shall be made for the additional thereof.
An equilateral triangle has three sides of equal length. The sum of the three internal angles (60o each) equals 180o
Provisional sum is an amount quoted for an item in a tender document where all of the design information is not fully specified. The provisional sum should be as accurate as possible with the information to hand A variation is an item within a construction project that was not originally specified in the contract tender document and so is a 'variation to contract'.