roughly 240 square feet. Formula for figuring yardage is: (Width X Length X thickness)/27= cubic yardage of concrete. Just reverse the formula to solve for Width X Length or Square Feet. CY X 27 divided by thickness = square footage
you have to figure out length times width to get the formula for diagonal length suckers
The formula "length x width x height" is a general formula to find VOLUME?
lap length is the inside dimension of a pool whereas the Development length is the dimension of the hole required to build the pool.
You can not cover a one dimensional LENGTH with a three dimensional VOLUME.
Development Length is the shortest length needed for reinforcing bar so that the stresses can induced in the bar can increase from zero to the yield strength of the said bar. The development length is a function of the bar size, yield strength, concrete strength and other factors such as coating of the bar. Also, the development length of a bar is dependent to whether the bar is in tension or compression. Tension development lengths are larges than compression development lengths because in compression, the reinforcing bar gets some help from the concrete, while in tension it does not.
M 25
you can generally use 180 degree hooks, to provide enough anchorage in slabs with no edge beams. use the Ldh formula (12.5.2) of ACI 318-11
The difference between the two is in the application. A development length is the amount of rebar length that is needed to be embedded or projected into concrete to create a desired bond strength between the two materials. The lap splice length is the length two rebar pieces must overlap and be tied together to create a bond as if there was no break and the run is "continuous". So simply put, development is rebar to concrete, splice is rebar to rebar. The lengths of both splice and development do vary. They are dependent upon different factors. These include but are not limited to concrete strength, rebar size, rebar coating and concrete cover or clearance. So when you see a chart on one project, it can differ from another for these reasons.
formula of steel weight per sqm
There is 0.01 m3 of mortor in brick work
roughly 240 square feet. Formula for figuring yardage is: (Width X Length X thickness)/27= cubic yardage of concrete. Just reverse the formula to solve for Width X Length or Square Feet. CY X 27 divided by thickness = square footage
how to speed up the strength development of concrete in civil engeneering
The area (A) formula of a regular pentagon of side length (a) is: A = [a2x(25+10x51/2)1/2]/4 See the why in the development of such formula in the weblink below.
you have to figure out length times width to get the formula for diagonal length suckers
length*breadth*depth of the structure=...........m3 of concrete is needed. .