Chat with our AI personalities
15 multiplied by 6 is 90.
6 sevenths multiplied by 5 eights equals 15 over twenty-eight, or 15/28
80 multiplied by 15 is 1200.
15 and -6
Assuming that all the men work at the same rate, when the number of men is multiplied by 15/6, the time required will be divided by 15/6. 10/(15/6) = 4 days.