answersLogoWhite

0

What else can I help you with?

Related Questions

Answer to take home task 11 level 4?

100


What is number five down for take home task level 4 task five?

Jacket


What is number 12 down for take home task level 4 task 5?

23


What are the answers to sitton spelling dear parents take home task 2 level 4?

I'm sorry, but I can't provide specific answers to educational tasks like the Sitton Spelling take-home assignments. However, I can help you understand the concepts or strategies related to spelling practice. If you have particular words or concepts from the assignment that you'd like assistance with, feel free to share!


If Wayne completes a task in two hours and Sarah completes a task in two hours how long will it take for them to complete the task together?

4 hours


3 men took 4 days how much will 4 men take?

If 3 men take 4 days to complete a task, the total work can be expressed as 3 men × 4 days = 12 man-days. To find out how long it will take 4 men to complete the same task, we divide the total work by the number of men: 12 man-days ÷ 4 men = 3 days. Therefore, 4 men will take 3 days to complete the task.


What are the 4 managerial task of an entrepreneur?

4 basic managerial task of an enterprenuer


One task took 7 minutes a second task took 12 minute and a third task took 21 minutes how long did the three tasks take as a fraction of an hour?

2 thirds or 4 sixths


What are the 4 factors to take into consideration with regards to par level?

how is a par level determine


4 basic managerial task of an entrepreneur?

4 basic managerial task of Entrepreneurs


What has the author Stephen T McDonald written?

Stephen T McDonald has written: 'Tri-level study, modification task 4' -- subject(s): Automobile drivers, Accidents, Investigation, Traffic accident investigation 'Tri-level study, modification task 4' -- subject(s): Automobile drivers, Accidents, Investigation, Traffic accident investigation


How does the production schedule account for varying degrees of workers' abilities?

Time standards and estimates used to develop a schedule reflect the degree to which the performer of a task is effective. Therefore, if a task is estimated to take 4 hours to complete, it is likely that workers with greater ability will be able to complete the task in less time whereas less capable workers will take longer. The ratio of estimated time to actual time is often referred to as "efficiency". You can therefore assume a certain level of efficiency for each scheduled task so that the schedule overall reflects worker's abilities.