Generally speaking it varies depending on the size and complexity of the project and what is involved. As a general rule projects unde 1 Million with a reasonable simplicity for construction should be around the 5-6% of your total tender price.

User Avatar

Wiki User

13y ago

What else can I help you with?

Related Questions

How do you find out who is on a book cover?

Front matter or preliminaries, which include the title page, copyright information, dedication, table of contents, foreword, preface, and acknowledgements. The items that are included may depend on the book, but in general, this area is where these items appear. Often front matter pages are numbered separately with lower-case roman numerals, such as i, ii, iii.


What are list of building preliminary items?

Building preliminaries involves site investigation,access road,site clearance,feasibility study etc before the actual construction begins.


What are 20 list of Preliminaries items?

Preliminaries in a project or construction context typically include items that set the stage for the main work. A list of 20 preliminaries items might include: Site preparation and clearing Temporary site facilities Utilities connections Safety measures and signage Temporary fencing Environmental controls Insurance and bonds Permits and approvals Site drainage systems Access roads and pathways Waste management plans Construction scheduling Site security measures Temporary power supply Water supply arrangements Material storage areas Communication systems Labor facilities (e.g., rest areas) Traffic management plans Quality control procedures These items ensure that a project is set up efficiently and safely before the main construction begins.


What is the approximate capacity of short-term memory?

Usually about 7 items


What is project overhead costs?

It is all the cost that is associated to a proper running of site but not directly related to the construction.ORThe site cost of administering a project and providing general plant, site staff, facilities and site-based services.Project overheads are priced in the preliminaries section of bill of quantities and will include items such as supervisory labour, Site office.


What is a method of estimating or predicting an approximate number of events among a large set of items?

samplingsampling


How to price preliminaries?

To price preliminaries, first identify all necessary preliminary items such as site preparation, permits, and temporary facilities. Calculate the costs associated with each item, including labor, materials, and overhead. It's also important to consider contingencies for unforeseen expenses and to benchmark against industry standards or similar projects. Finally, present the total cost as a clear line item in your overall project budget for transparency.


What percentage of items in a store are not made in the US?

Depends on the store. Oakley has 100% of their items made in the US


What does the general store do in FarmVille?

store the items


The following items are available for use in a pan balance to measure the weight of a large rock. Which items will yield the greatest level of accuracy that is approximate the true weight of the rock?

The answer is marbles


What items increase recruition percentage in blue rescue?

Get a friend bow.


What is the percentage of VAT levied in India for electronic goods?

electronic items