The average construction labor cost per hour is around 30 dollars an hour. This is what a qualified and seasoned worker makes.
From an article in May 2006, with the link below, the average labor cost per hour in the US seems to be around $19, rounded. That compares with Europe where the average rate is about €23, after rounding.
Direct labor hour rate is the per hour wage rate paid to skilled or unskilled labor to make one unit of product.
The average speed is 110 km per hour.
If I walk 4 kilometers in an hour, my average speed during that hour was 4 km/hour. My instantaneous speed may well have been faster at times, and slower at other times, 4 km/hour is only the average.
The average construction labor cost per hour is around 30 dollars an hour. This is what a qualified and seasoned worker makes.
From what I have seen in my area the average labor per hour cost in a licensed certified shop is $90.00 + per hour
From an article in May 2006, with the link below, the average labor cost per hour in the US seems to be around $19, rounded. That compares with Europe where the average rate is about €23, after rounding.
The cost to get hedges trimmed will depend on the company used and the cost of labor. On average, it will be about $20 dollars an hour.
The average cost of labor to replace a heater core will vary from dealer to dealer. The national average is around 105 dollars per hour.
Variable manufacturing overhead cost per direct labor hour means the variable overhead cost spent for one single labor hour and formula is as follows:Variable overhead cost per labor hour = total variable overhead cost / Total direct labor hours
Rates is cost-per-hour, labor cost is the total, regardless of time.
A rebuilt starter could cost from $ 100.00 to $ 150.00. The labor is 1 hour with the car on a hoist.
A rebuilt starter could cost from $ 100.00 to $ 150.00. The labor is 1 hour with the car on a hoist.
Labor costs for installing a Pergo floor will be determined by how long the job takes. Typically a six hour Pergo floor installation will cost $400 in labor.
If the Revenue for the week is 2000 and labor cost consists of two workers earning 8 per hour who work 40 hours each, the labor cost as a percentage is 68%.
Six hours of labor to replace your 1998 Chevrolet Cavalier clutch. The cost will be determined by the labor rate. $75 an hour for labor will cost $450.