39% of 62 = 62*39/100 = 24.18 = 24.2 to the nearest tenth
62 is the average.
62 = 36 72 = 49 So 6 < sqrt(39) < 7
89.5 is the average.
62 + 79 + 9 = 150 and there are three values so average = 150/3 = 50
59
39% of 62 = 62*39/100 = 24.18 = 24.2 to the nearest tenth
At an average 60 mph: 62 hours, 39 minutes
24.18
$62. <---is about right.
39-14 average = 25
The range is 37. (62 - 25 = 37)
The average of 148 and 39 is the sum of 148 and 39 divided by 2, or 187/2, or 93.5
The average is 81.
62 is the average.
62 = 36 72 = 49 So 6 < sqrt(39) < 7
The output work can be calculated using the formula: output work = efficiency * input work. Plugging in the values given, the output work would be 24.18 J.