630
1500 sq. ft = 1,393,546 sq. cm.
The construction cost per square foot in Asheville, North Carolina is about $88 per square foot. This means a 3000 square foot building would cost about $264,000 to build.
You must have meant square foot (otherwise it would be only 1 dimension).We simply divide the 2 values, yielding:220/1500 = 22/150 = $0.14(6) (repeating period 3), which is rounded up to $0.15, or 15 cents.
The cost per square foot to frame a home in Illinois is about $98. This means to frame a 1800 square foot home, it would cost about $176,400.
The 1500 square foot building would have a rental cost of $21,000. You don't specify the terms of any lease.
it is 1.9999999999
the average cost of a square foot of a school building is about 1500
1500x 1.25
If you want the price per square foot, divided 4000 by 1500. The price is 2.66 per square foot.
Just paid $2.40 a square foot , this included all prep work for a new driveway aprrox 1500 square. Checking prices it could range from $2 - $4 a square foot for 3-4 inchs thick.
You can expect a professionally installed system using high quality parts to cost from $1500 to $2500 per 2500 square foot. So it would be about $10,000
what is the cost of a roof per square foot
630
1500 sq. ft = 1,393,546 sq. cm.
$26,250.00. $17.50 x 1500.
The construction cost per square foot in Asheville, North Carolina is about $88 per square foot. This means a 3000 square foot building would cost about $264,000 to build.