Chat with our AI personalities
Don't know for sure but I would guess that this indicates the maximum weight the crane can lift.
This doesn't seem like a smart thing to do.
X = hours 750 + 250X = 2500 250X = 1750 X = 7 hours
There is one syllable. Crane.
If the consequences when the estimation or calculation error is at its minimum are very seriously negative. For example, suppose the lifting capacity of a crane is 10 tons to the nearest ton. That statement implies that the capacity is anything between 9.5 and 10.5 tons. You must use the underestimate: 9.5 tons since that could be the true limit, and the crane could fail at anything higher.