94 + 94 = 188...
90% of 94= 90% * 94= 0.9 * 94= 84.6
1, 2, 47, and 94 are the factors of 94. 1 x 94 = 94 and 2 x 47 = 94.
94% simplified as a fraction = 94/100 or 47/50 94% = 94%/100% = 94/100 or 47/50 in fraction
50 + 50 + 94 + 94 = 288
The ratio is 94:141
94/50 = 1.88
Could be 3.07, 3.55, or 3.73
depends on yr, weight and gear ratio. I had a 94 and it was bout 80+, but hard to gauge when trail riding.
madar chod
Remove the cover plate and you will find the numbers stamped on the ring gear side which are two set of numbers divided within a dash, divide the smaller into the larger to come up with the ratio.
94 + 94 = 188...
Concrete is measured in metric volume via cubic yards. Standards consider a 94 lb. bag of cement to be one cubic foot when freshly packed. 94 evenly fits into the 1-2-3 mix ratio when figuring the recipe 1 part cement- 2 parts gravel- 3 parts sand to make concrete.
Any multiple of 94, that is: 94 x 0 94 x 1 94 x 2 etc.
Checking the build code, GU2, shows the rear gear is 2.73 and not 3.43 as noted with the six speed on most web sites. 3.43
19% of 94 = 19% * 94 = 0.19 * 94 = 17.86
460% of 94= 460% * 94= 4.6 * 94= 432.4