answersLogoWhite

0


Best Answer

The ratio of M30 to WHAT!

User Avatar

Wiki User

10y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: What is the ratio of M30?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

How is the ratio for M30 concrete finalised?

m-30


What is the Poisson's ratio value of M30 grade concrete?

0.17


What is the poissons ratio value for M30 concrete?

between .15 and .20


What is the mixing ratio of cements and aggregates and water in M30 concrete?

from M30 onwards the mixes are designed. they dont have a const ration as in the case of mixes like M10, M15....,M25


What is sand cement grit ratio for making M30 paver blocks?

1:1.5:3


What is the ratio of cement sand and aggregate in M30 mix of concrete?

The ratios of cement to sand to aggregate for the different grades of concrete are as follows. M10 has a ratio of 1:3:6. M15 has a ratio of 1:2:4. M20 has a ratio of 1:1.5:3. M25 has a ratio of 1:1:2, but M30 has no set ratio. It is a designed mixture to achieve the stress tolerance desired.


How do you disarm alarm on 1992 Infiniti m30?

pull the alarm fuse or relay. www.f31club.com... all m30 owners club.


What kind of car is BMX M30 exactly?

BMX refers to a bicycle and no model M30 exists for BMX. A BMW M30 is an engine with a straight-6 that was used in many BMW cars over the 28 year life of this engine.


Which purpose you are using M30 grade concrete?

we use M30 grade concrete commercial slabs like shopping malls . college buildings


Does 1991 infiniti M30 have a timing belt or chain?

According to the Gates website the 3.0 liter V6 engine in a 1991 Infiniti M30 has a timing BELT


What is the concrete mixing ratio in m60 concrete?

cemet: sand: Agg=1:1:2 (Nominal Mix) Above answer is not as per engineering standards. For concrete mixing ration in M30 grade concrete, the mix has to be designed after testing all the materials including water in labs. When you go for higher grade of concretes the mix has to be designed , it is the water to cement ratio which has to be monitered for higher grades of concrete


Use of m02 code in cnc program?

indicates the number of machined parts.the number id incremented each time m02,m30 m02= program end m30 =