answersLogoWhite

0

In Power Lines Level 5, the solution involves strategically connecting the power lines to ensure all nodes are powered without crossing lines unnecessarily. Focus on creating a path that minimizes intersections while maintaining power flow to each point. An effective approach is to start from one end and work systematically towards the goal, adjusting connections as needed to avoid conflicts. If you're stuck, consider experimenting with different configurations to find the optimal layout.

User Avatar

AnswerBot

1w ago

What else can I help you with?