Convert 2500 ft into miles
It will cost between $4600 and $6100 depending on the contractor, number of layers to remove and material used.
Assuming that the sod will just cover the surface area of the plot, multiply the width by the length to get the surface area of the spot you want to cover with sod.10 x 11 = 110So you would need 110 square feet of sod.
2500 sq ft.
500 sq ft In our area it 600 sq ft. Call your supplier to find out.
About $1.50 per sq ft. sod and labor included, but site preparations are separate charge. In our area it is much less- depending on the size of the job it can run from $0.30 to 1 per sq ft including sod and labor.
About $2 per sq ft.
Convert 2500 ft into miles
80$ per sq/ft
9sq ft
I just purchased hybrid Bermuda - 2200 sq ft for $675
It will cost between $4600 and $6100 depending on the contractor, number of layers to remove and material used.
4 x4 ft
Assuming that the sod will just cover the surface area of the plot, multiply the width by the length to get the surface area of the spot you want to cover with sod.10 x 11 = 110So you would need 110 square feet of sod.
A 50 square yard pallet of sod weighs approximately 1 ton ... between 1500 and 2000 pounds. A lot depends on the saturation of the soil.
2500 sq ft in 6 hours is 2500/6 = 1250/3 = 416â…” sq ft/hr.
2500 sq ft.