Chat with our AI personalities
Well, the area of the floor would be 25*12, which is 300m2 which means that you would divide 300 by 7 to get around 42.8571419, which is how many liters of sealer that would be required to seal that floor.
a=l2 l= (a)(1/2) l=(169.68ft)(1/2) l=13.0261ft
324
Till Size required (i.e 3*?)
it means mezzanine floor, a floor which is between the ground floor and the first floor.