well if 12 months is 365 days (if not a leap year) then 14 months is 424 days i think anyway lol, hope i was right, and my answer helped :D!!
100 days is approximately equal to 3 months and 10 days. An average month is 30.4 days which would make the values: 2 months and 10 days = 70.4 days 3 months and 10 days = 101.2 days 4 months and 20 days = 141.6 days 4 months and 10 days = 131.6 days
It depends on which months, but there are 30 and 5/12 days on average to 6 multiplied by that is 2190/12 =182.5 An easier way to asnwer this is to say 365 days in a year and 6 months is half a year so there are 365/2 days which is also 182.5
121 days = about 4 months.
I assume you mean months which about 2 months are in 60 days. If not 60 days are in 2 months. Then maybe its in 3 months in a half
©§gfhsdoj;efnsez
196 days. I think...
well if 12 months is 365 days (if not a leap year) then 14 months is 424 days i think anyway lol, hope i was right, and my answer helped :D!!
196 days. I think...
In the casual sense, people think of months as having 30 days, though more have 31 days. So in the casual sense, that would be 12 months, though technically, that is 5 days short of a year.
The ancient civil Egyptian calendar had a year that was 360 days long and was divided into 12 months of 30 days each, plus five extra days at the end of the year. The months were divided into three weeks of ten days each.
yes because they thought they're are 360 days not 365 because, they notice that there are 12 months
100 days is approximately equal to 3 months and 10 days. An average month is 30.4 days which would make the values: 2 months and 10 days = 70.4 days 3 months and 10 days = 101.2 days 4 months and 20 days = 141.6 days 4 months and 10 days = 131.6 days
It depends on which months, but there are 30 and 5/12 days on average to 6 multiplied by that is 2190/12 =182.5 An easier way to asnwer this is to say 365 days in a year and 6 months is half a year so there are 365/2 days which is also 182.5
i think the paralympics run for 2 months
well in the old days the nile...when it flooded these days they still use water from the nile i think...but through irrigation like other places...
1090 days = 36 months, approx.1090 days = 36 months, approx.1090 days = 36 months, approx.1090 days = 36 months, approx.