The production rate per worker is 15.000 metres/8 workers/week = 1875 metres/worker/week. Multiplying this number by 4 workers and 4 weeks yields 30.000 metres as the answer.
A hactor is a unit of measurement used in the garment industry to determine the breathability of a fabric. It calculates the amount of water vapor that can pass through a fabric in a specific time period. A lower hactor value indicates better breathability.
The amount of fabric needed to construct pants typically ranges from 1.5 to 3 meters, depending on the size of the pants and the width of the fabric. For standard adult sizes, about 2 meters is usually sufficient. However, larger sizes or styles that require more fabric, such as wide-leg pants, may need up to 3 meters. Always consider additional fabric for patterns, seams, and any design elements.
A standard king size sheet typically requires about 10 meters of fabric. However, this may vary depending on the specific measurements and design of the sheet.
To convert grams per square meter to grams per linear meter, you would first need to know the width of the fabric in meters (150 cm = 1.5 meters). Then, you can divide the grams per square meter by the width in meters to get grams per linear meter. For example, if you have fabric that is 200 gsm and 1.5 meters wide, the calculation would be 200 gsm / 1.5 meters = 133.33 g/lm.
You will need at least 6.06 square meters of material.
Meters
A hactor is a unit of measurement used in the garment industry to determine the breathability of a fabric. It calculates the amount of water vapor that can pass through a fabric in a specific time period. A lower hactor value indicates better breathability.
Fabric, Cable, Wire, Rope
There are 5.4680665 yards in 5 meters of fabric. 5 meters x 1.0936133 yards/1 meter = 5.4680665 yards 1 meter = 1.0936133 yards
Area of a piece of fabric = (length) times (width) .Example:If the fabric is on a roll that's 1.5 meter wide,and you cut off a piece that's 3 meters long . . .You have a piece that's 3 meters long and 1.5 meters wide.Area = (3) x (1.5) = 4.5 square meters.
2.5 mts fabric needed for ladies top
one meter and 15 cm
Its according to your size.
6 hours
that depends on size and style
A standard king size sheet typically requires about 10 meters of fabric. However, this may vary depending on the specific measurements and design of the sheet.
The standard meter of fabric used in the production of clothing items is typically 1.5 meters.