A standard FIFA regulation soccer field must have a width between 50-100 yards and an area between 5000-11000 square yards. In this case, a field with a width of 75 yards and an area of 7500 square yards falls within the FIFA regulations as it meets both criteria. Therefore, this field would be considered within FIFA regulation standards.
Twenty-one .75 cubic foot bags equal 16 cubic feet.
1 yard = 36 inches so 0.75 yards = 36*.75 = 27 inches.
55 feet is 18.3 yards (divide feet by three).
There are 75 feet in 25 yards.We know that 1 yard = 3 feet.To find: 25 yards =? feet25 yards = 3*25 feet25 yards = 75 feet75 feet
12.04 cubic yards.
4.23776 cubic yards
26 cubic yards = 702 cubic feet
You need to know how much area you are covering and how thick you want the mulch to be. Roughly 3 inches thick is good enough. That is 3/12 = 0.25 feet thick Take area in square feet times thickness in feet, which gives a volume in cubic feet, then divide by 27 to covert to cubic yards For example, if you want to mulch an an area that is 75 feet long and 5 feet wide, the volume is 75 x 5 x .25 = 93.75 cu ft 93.75/27 = 3.5 yards (3 and 1/2 yards)
That is impossible. A yard is a measure of length or distance and a square yard belongs to an area. If it means that 75 square yards is the "area of a real square", then the side length of this square is 8.660254038 yards.
75 cubic feet
None. A cubic foot is a measure of volume (in 3-d) while a square foot is a measure of area (in 2-d). The two measure different things and, according to basic principles of dimensional analysis, conversion from one to the other is not valid.
Assuming a thickness of four inches, there would be a total of 139 (138.89) cubic yards of concrete.
No
15X15X.33(4/12 there is 4 inches in a foot therefor 4" is .33 of a foot) equals 74.25 cf of concrete divide by 27 (three demensional object for yards) 2.75 Cubic Yards. if you try to order .75 cubic yards of concrete you will be laughed at, just order 3 cubic yards and make a entrance path. good luck.
210/3 = 70 yards so 75 yards is greater
25856 / 27 = 958 yards of concrete @ $75 per yard = $71,850