25 mm = 0.025 meter
Volume = 7,200 m2 x 0.025 m = 180 m3
20 mm = 0.020 meters 18 square meters * 0.020 meters = 0.36 cubic meters
Meters cubes are a unit of volume, meters squared is a unit of area. They are different things, so you can't convert between them.You can not, a 2 dimensional object can not become a 3 dimensional object via conversion as the 2d object has no depth by witch to convert to.
To find the volume in cubic meters needed to cover 36 square meters, we need to know the desired thickness of the material being used for coverage. The volume can be calculated by multiplying the area (36 square meters) by the thickness of the material in meters.
100 cubic feet = 2.83 cubic meters
1 cubic foot = 0.0283168466 cubic meters
1 Cubic Yard Spread To A Depth Of 1.5" Will Cover 216 Sq. Ft Or 20 Sq Meters
3029.7 squared meter X (500mm / (1000mm/1m)) 3029.7 squared meters x (500mm *1m/1000mm) 3029.7 squared meters x .5m 1514.85 cubic meters
You can't convert between square and cubic units.
You would need 31.88 cubic yards of topsoil to cover 855 sq feet at 6 inches deep.
Almost exactly 2.00 cubic yards for every inch of topsoil depth.
Invalid conversion: square meters is a measure of area and cubic meters is a measure of volume.
77/9 cubic yards for every inch of depth.
336 cubic meters
For a 60cm depth of topsoil, you would need 0.6 cubic meters (or approximately 0.78 cubic yards) of topsoil. This calculation is based on the formula: Volume = Area × Depth.
Use this formula: square miles per kg3 x1.93368166 × 1015 = cm2 per cubic ton
A square metre is a unit of area. A cubic metre is a unit of volume. The two units are therefore incompatible.
A cubic metre is a unit of volume. A square metre is a unit of area. The two units are therefore incompatible.