Your 1 cubic meter = 1.30795 cubic yards.
The meter is a bit more than a yard, so a cubic meter will have a bit more than a cubic yard in it. The cubic meter is actually about 1.30795 cubic yards, so since we're just doing a "ball park" estimate, our guess that a cubic meter is about the same as a cubic yard is only off a bit. A cubic meter is about 1.3 cubic yards if you wish to get a bit more specific.
You have 15.2911 cubic meters. 1 cubic yard is equal to 0.764555 cubic meter.
One cubic meter is 1.31 cubic yards. So, 10 cubic meters = 10 x 1.31 = 13.1 cubic yards
Cubic yards x 0.7645 = cubic meters.
This may help or not. A cubic meter of concrete weighs 1(one) tonne Metric. If you convert 1 tonne to pounds and a cubic meter to cubic yards, then, you have it. 1cubic meter=1.30795037 cubic yards. 1tonne=0.98420625 of a ton..1ton=2240pounds. Mate, I hope that's right. If not it'll give you something to go on with.
1 cubic meter is 1.308 cubic yards.
1.308 cubic yards per cubic meter.
1.30795 (rounded)
About 1.307 cubic yards are in one cubic meter.
The meter is a bit more than a yard, so a cubic meter will have a bit more than a cubic yard in it. The cubic meter is actually about 1.30795 cubic yards, so since we're just doing a "ball park" estimate, our guess that a cubic meter is about the same as a cubic yard is only off a bit. A cubic meter is about 1.3 cubic yards if you wish to get a bit more specific.
1.295cu.yd 1.295cu.yd
1.30795 (rounded)
There are 1.3 cubic yards in a cubic metre (or 'stere' as it is correctly termed)
3
You cannot covert distance to volume.
One cubic meter is equivalent to 35.23 cubic feet, or one cubic meter is equivalent to 1.35 cubic yards.
You have 15.2911 cubic meters. 1 cubic yard is equal to 0.764555 cubic meter.