Best thing to do is contact the concrete company directly, because the price will vary by different mixes, and delivery fees will vary by distance traveled. You also need to know the desired depth of the concrete. Concrete companies sell it by the cubic yard, which is calculated by area and depth.
1 yard = 3 feet 1 cubic yard = 27 cubic feet 1 inch = 1/12 feet Then: Square feet = (100 x 27)/ ( 2 x 1/12) = 2700 x 6 =16200 sq feet
To determine how many cubic feet of concrete are needed, you first need to know the depth of the concrete slab. For example, if the slab is 6 inches thick, you would multiply 360 square feet by the thickness in feet (6 inches = 0.5 feet) to get 180 cubic feet of concrete required.
you can not answer that as area and length are different
There is no way to answer that without knowing how deep the concrete will be.
24 inches is 2 feet and so 2 times 2 = 4 square feet
1400 square meters / .0929 = 15,070 square feet
Depends where you are living.
1400 square meters = 15,069.47 square feet.
A cubic measure ment is required
Answer: 1400 ft² = 130.064 m²
1,400 square feet = 130.064256 square meters.
1,400 square feet = 130.1 square meters
Multiply square feet by 0.092903 to get square meters.
35x40 feet is equal to 1400 square feet.
Answer: 1400 ft² = 0.032139 acres.
Alright, buckle up, buttercup. To convert square feet to square yards, you divide by 9. So, 1400 square feet is 155.56 square yards. Math doesn't have to be your enemy, darling.
15,069.47 square feetsquare meters x 10.7639 = square feet