To convert cubic feet to cubic yards, divide the number of cubic feet by 27. This is because 1 cubic yard is equivalent to 27 cubic feet.
To convert 400 square feet at 5 inches deep to cubic yards, first convert depth to yards (5 inches = 5/36 yards). Then, multiply 400 sq ft by the depth in yards to get the volume in cubic feet (400 * 5/36 = 55.56 cubic feet). Finally, convert cubic feet to cubic yards (1 cubic yard = 27 cubic feet), giving you approximately 2.06 cubic yards.
To convert from square feet to cubic yards, you need to account for the third dimension. Since you are dealing with a thickness of 2 inches, you first convert the 2 inches to feet (2 inches is 0.167 feet). Then, you multiply 4000 square feet by 0.167 feet to get the volume in cubic feet. Finally, convert cubic feet to cubic yards (1 cubic yard is equal to 27 cubic feet) to find the answer. In this case, 4000 square feet by 2 inches is equivalent to approximately 25.9 cubic yards.
To find the volume in cubic inches, multiply the length, height, and thickness: 480 x 108 x 7 = 362,880 cubic inches. To convert cubic inches to cubic yards, divide by 46,656 (since 1 cubic yard = 46,656 cubic inches): 362,880 / 46,656 ≈ 7.77 cubic yards.
To convert cubic yards to cubic feet, you multiply the number of cubic yards by 27. This is because 1 cubic yard is equal to 27 cubic feet.
I would use 1/36 to convert inches to yards and 1/1760 to convert yards to miles.
Cubic inches x 0.00002143 = cubic yards * 79,000 x 0.00002143 = about 1.693 cubic yards
(One cubic yard is equal to 46,660 cubic inches). So, 0.25 cubic yards x 46,660 = 11,660 cubic inches.
To convert cubic feet to cubic yards, divide the number of cubic feet by 27. This is because 1 cubic yard is equivalent to 27 cubic feet.
Multiply the number of cubic yards by 46,656 (or divide it by 0.00002143) in order to get the number of cubic inches in the same volume. Multiply the number of cubic inches by 0.00002143 (or divide it by 46,656) in order to get the number of cubic yards in the same volume.
24 cubic feet = 0.89 cubic yards
To convert 400 square feet at 5 inches deep to cubic yards, first convert depth to yards (5 inches = 5/36 yards). Then, multiply 400 sq ft by the depth in yards to get the volume in cubic feet (400 * 5/36 = 55.56 cubic feet). Finally, convert cubic feet to cubic yards (1 cubic yard = 27 cubic feet), giving you approximately 2.06 cubic yards.
To convert from square feet to cubic yards, you need to account for the third dimension. Since you are dealing with a thickness of 2 inches, you first convert the 2 inches to feet (2 inches is 0.167 feet). Then, you multiply 4000 square feet by 0.167 feet to get the volume in cubic feet. Finally, convert cubic feet to cubic yards (1 cubic yard is equal to 27 cubic feet) to find the answer. In this case, 4000 square feet by 2 inches is equivalent to approximately 25.9 cubic yards.
To find the volume in cubic inches, multiply the length, height, and thickness: 480 x 108 x 7 = 362,880 cubic inches. To convert cubic inches to cubic yards, divide by 46,656 (since 1 cubic yard = 46,656 cubic inches): 362,880 / 46,656 ≈ 7.77 cubic yards.
You cannot. Inches are a measure of distance whereas yards per hour is a measure of speed. The two measure different things and you cannot convert from one to the other without additional information.
To find the volume of gravel in cubic yards, first convert the depth to yards: 2 inches is 1/6 yard. Then, multiply the dimensions to get the volume in cubic yards: 5 yards wide x 28 yards long x 1/6 yard deep = 23 1/3 cubic yards. Since 1 cubic yard is equal to 1,296 square inches, multiply the volume by 1,296 to convert to square inches: 23 1/3 cubic yards x 1,296 = 30,158.22 square inches. Finally, divide by 9 to convert square inches to square yards: 30,158.22 square inches / 9 = approximately 3,350.91 square yards of gravel.
2.3 cubic yards is 107,308.8 cubic inches.