1 cubic yard = 27 cubic feet 0.6 cubic yards = 16.2 cubic feet 38 cubic feet = 1.407 cubic yards (rounded)
The volume of the hole is 2 yards * 3 yards * 1 yard = 6 cubic yards. To convert this to cubic feet, we multiply by 27 (since 1 cubic yard = 27 cubic feet). Therefore, the volume of the hole in cubic feet is 6 cubic yards * 27 cubic feet = 162 cubic feet of dirt.
There are 27 cubic feet in 1 cubic yard, so to convert cubic yards to cubic feet, you would multiply by 27. Therefore, 5.2 cubic yards is equal to 140.4 cubic feet.
There are 35 cubic yards in a trench that is 210 feet long, 6 feet wide, and 9 feet deep. This can be calculated by multiplying the length, width, and depth in feet (210 x 6 x 9) and then dividing by 27 to convert cubic feet to cubic yards.
3 feet = 1 yard 1000 feet / 3 = 333.33333 cubic yards
1 cubic yard = 27 cubic feet 0.6 cubic yards = 16.2 cubic feet 38 cubic feet = 1.407 cubic yards (rounded)
A cubic yard is 3' x 3' x 3', or 27 cubic feet. Therefore, 2 cubic yards is 54 cubic feet.
Assuming you are saying 6 feet, the answer is 3351 cubic yards.
The volume of the hole is 2 yards * 3 yards * 1 yard = 6 cubic yards. To convert this to cubic feet, we multiply by 27 (since 1 cubic yard = 27 cubic feet). Therefore, the volume of the hole in cubic feet is 6 cubic yards * 27 cubic feet = 162 cubic feet of dirt.
There are 27 cubic feet in 1 cubic yard, so to convert cubic yards to cubic feet, you would multiply by 27. Therefore, 5.2 cubic yards is equal to 140.4 cubic feet.
There are 35 cubic yards in a trench that is 210 feet long, 6 feet wide, and 9 feet deep. This can be calculated by multiplying the length, width, and depth in feet (210 x 6 x 9) and then dividing by 27 to convert cubic feet to cubic yards.
When it comes to mulch or concrete, a so-called "yard"actually means a "cubic yard".1 cubic yard = 27 cubic feet2 cubic yards = 54 cubic feet...6 cubic yards = 162 cubic feet ( = 81 bags )
240 cubic feet = about 8.9 cubic yards. (8.88888889 cubic yards).
6 inches = 0.5 feet 256 square feet * 0.5 = 128 cubic feet There are 27 cubit feet in a cubic yard (3 feet x 3 feet x 3 feet), so 128 cubic feet = 4.741 cubic yards.
3 feet = 1 yard 1000 feet / 3 = 333.33333 cubic yards
0.52 cubic yards = 14.04 cubic feet.
To convert the measurements into yards: 30 feet = 10 yards 6 feet = 2 yards 6 inches = 0.5 feet = 0.167 yards Calculate the volume of the hole in cubic yards: 10 yards x 2 yards x 0.167 yards = 3.34 cubic yards Therefore, you would need 3.34 cubic yards of dirt to fill the hole.