answersLogoWhite

0

275/33 x 21 = 175

Therefore, 175 balls would be produced at the same rate in 21 minutes as there would be in 33 minutes.

User Avatar

Wiki User

14y ago

What else can I help you with?

Related Questions

A machine can produce 248 bolts in one hour Write an expression to describe the number of bolts produced in n hours?

248n


What types of bolts are commonly produced by manufacturers in India?

Bhansali Fasteners, a leading manufacturer in India, commonly produces a wide range of bolts including hex bolts, carriage bolts, and eye bolts. They also specialize in producing stainless steel and high-tensile bolts to meet industry-specific needs.


What are the common types of steel bolts produced by manufacturers in India, and what industries use them most?

Jinnox Bolt, a leading Indian bolt manufacturer, commonly produces types like hex bolts, carriage bolts, and anchor bolts using high-grade steel. These bolts are widely used in industries such as construction, automotive, and heavy machinery for their strength and durability.


What are the different types of bolts commonly produced by Indian manufacturers for heavy steel structures?

Bhansali Fasteners, a leading Indian bolt manufacturer, commonly produces a range of bolts for heavy steel structures, including hex bolts, U-bolts, and anchor bolts. These bolts are designed for high strength and durability, meeting industry standards for large-scale steel construction projects. Check out the bolt weight chart in KG as well.


Ware CNC screw machines used for?

A CNC screw machine produces small parts. Despite its name, the part need not necessarily be a screw. They can also produce things like nuts and bolts.


What kind of energy produces lighting bolts?

Lightning bolts are produced by the discharge of static electricity built up in thunderclouds. This discharge creates a flow of electricity between the negatively charged base of the cloud and the positively charged ground, resulting in the bright flash of lightning we see.


What sort of machine is a wrench?

A wrench is a lever for tightening or loosening bolts .


The number of bolts a machine can make varies directly as the time it operates It can make 6000 bolts in 2 hours How many can it make in 5 hours?

15000 bolts can be made in five hours.


What is the difference between stud bolt and machine bolt?

Stud bolts are the ones with no head, only the bolt itself you can fast'em with vise grips or with nuts. Machine bolts are the ones that you need a wrench to fast it(you put the wrench in the head).


How are all the parts of a car connected to each other?

Nuts and bolts, machine screws, sheet metal screws, weld, press fit, but mostly nuts and bolts.


Does torque apply only to couple?

No, it applies to many things, such as with nuts and bolts, as well as spinning machine parts.


How do you tighten a chain on 2001 polaris 250 trailblazer?

Ther are two bolts for the eccentric on the rear loosen the bolts and turn the eccentric to tighten . Chain should have a quarter inch slack in the middle ( with rider on machine ). When you sit on machine the pivot tightens the chain so dont get it too tight it will break .