Job workers using this formula as given :-
total hrs. in Single pass (Single cut)=Total Path length x job thickness / 1500
total hrs. in Double pass (Double cut)=Total Path length x job thickness / 1200
total hrs. in Triple pass (Triple cut)=Total Path length x job thickness / 900
total hrs. in Four pass (Four cut)=Total Path length x job thickness / 600
and the Rates are Rs.200.00/hr to Rs.250.00/hr.
For every three hours you work, you get payed for an extra hour! So if you work 6 hours you will get payed for 8! :)
Either calculate the distance travelled (in miles) and divide by the total time (in hours) taken to undertake the journey or calculate in other units and carry out a conversion.
450/40 = 11.25 an hour
Distance = Rate * Time or, for our purposes Time = Distance/Rate Time = 280 km/70 kmh = 4 hours -------------
Divide 245 miles by 3.5 hours.That gives 245/3.5 = [you can work this out] miles per hour.
in a normal 40 hour work week $/hour x 40 hours/week x 52 weeks/year Try the link below to experiment on some numbers
Usually one hour per hour.
If you are paid by the hour at a uniform rate, simply multiply the hours worked by therate per hour. If you are paid different rates, say for overtime or hazardous work,you would have to multiply each rate by the number of hours worked at that rate and add these to get the total gross pay.1916.67
yearly divided by weeks, divided by hours per week. Improved answer: There are 2,080 working hours a year for a 40-hour work week. Divide your yearly salary by this number to find out how much you earn per hour (provided you work a 40-hour week.)
The standard answer is to divide the annual rate by 2000 to get an hourly rate. Assumes a 40 hour work week and a 50 week work year$49,000 / 2000 hours = $24.50/hour
It depends on how hard you work out and when you work out. You can probably calculate it online.
A machine hour rate is the cost of one machine working for one hour. This is used in calculating overhead costs to work in process as opposed to using labor hours.
rate of production is the amount that your product is produced in a scale of time. for example the rate of production of a steam stripper would be 21 kg per hour or etc. To calculate the rate of production of something you need to have the power of your reactor (in watts). when you have the power you will be able to get energy that your reactor produces in a certain amount of time. By knowing the energy you'll be able to work out the amount (in kg) and work out the rate of production.
Assuming you work a 40 hour week - 9.615 per hour.
assuming you work a 40 hour week, including holidays, $8.17/hour.
Overtime is work done outside your normal daily hours. If you normally work an eight hour day, but work an extra hour one day. That extra hour is overtime, and overtime is often paid at a higher rate.
The hourly rate for a speech-language pathologist ranges from $21.34 to $51.75 an hour. Where you work, what city you work in, and experience can affect pay.