There are 3 cubit feet in 1 cubit yard. Although irrelevant in this context, you may wish to know that 1 cubit = 1.5 feet = 0.5 yards.
Since there are 10.764 square feet in one square meter, just multiply square meters by 10.764 to get square feet. In this case: 300 x 10.764 = 3,229.2 square feet.
If you multiply two lengths in feet, you get square feet, not cubic feet.
1 cubic foot = 12 x 12 x 12 = 1728 cubic inches 3456 cubic inches = 3456/1728 = 2 cubic feet
300 feet
To convert cubits to feet you need to multiply the origin by 1.4999999999999982
300 cubic feet = 2,244.156 gallons (rounded)
1 cubit = 1.5 feet so 1 cubit feet is an area of 1.5 square feet.
1 cubit = 1.5 feet so 1 cubit foot is an area of 1.5 square feet.
to convert yards into feet, multiply the yards by three. 300 x 3=900 300 yards=900 feet.
1 cubit = 1.5 feet so 27 cubit feet is an area of 40.5 square feet.
There are 3 cubit feet in 1 cubit yard. Although irrelevant in this context, you may wish to know that 1 cubit = 1.5 feet = 0.5 yards.
1 cubit = 1.5 frrt so 1.5 cubit feet = 2.25 square feet.
8 cubit feet = 12 square feet.
17.32051
None, since there can be no conversion. A cubit = 1.5 feet so a cubit foot (= 1.5 square feet) is a measure of area in 2-dimensional space. Energy is measured in terms of BTU per unit of volume or mass, not of area. So "BTU per standard cubit fet" is a nonsense unit.
A cubit equal 18 inches, so that would be 450 feet by 75 feet by 45 feet.