Calculate the area (for a rectangle, that would be length x width), then divide by the number of square meters covered by each bag.
5 bags.
First you need to work out how many square meters are in the path. To do that multiply 21 by 2.5 21 X 2.5 = ?sqm You know one bag of cement will cover 10 sqm so to find out how many bag are needed for the path divide the answer of 21 X 2.5 by 10 ?/10 = 6 bags
For M10 (1:3:6) Grade of concrete cement bag consumed = 4.4 bags/cum M15(1:2:4) Grade of concrete cement bag consumed = 6.6 bag/cum M20(1:1.5:3) Grade of concrete cement bag consumed = 8.2 bag/cum
108
Concrete is made from cement. This normally comes in 20 kg bags. So the answer is kilograms. A kilogram is roughly 2.2 pounds.
2 bags covers 5,000 square feet so you'll need 3 bags with enough fertilizer left over to cover 1,500 square feet.
How many cubic meters in 1 cement bag of 50kgs
You will need a minimum of 0.665 cubic meters of cement for this walkway. (if 60 lbs per bag, it is 52.1 bags. If 80 lbs per bag, it is 39 bags).
First you need to work out how many square meters are in the path. To do that multiply 21 by 2.5 21 X 2.5 = ?sqm You know one bag of cement will cover 10 sqm so to find out how many bag are needed for the path divide the answer of 21 X 2.5 by 10 ?/10 = 6 bags
As many as you can stack one above the other!
1 50kg bag fill about 2 cubic f. so for 102cu.f. you'll need 51 bags
If a 20kg bag of cement=0.1m3 with 100 lots o 0.01 to 1m3 then you will need 12.5 bags per m3. So you need approx 11.5m3 of sand and 144 bags of cement (144 x 0.01 = 1.44m3) to give you a total of 12.94m3
The answer will depend on the size of the cement bags! The answer will depend on the size of the cement bags! The answer will depend on the size of the cement bags! The answer will depend on the size of the cement bags!
1300
It depends on how high you can stack the bags!
2
The average coverage for one standard bag of plaster is 7 square meters, so divide 29 by 7 and you get a little over 4 bags. Purchasing 5 bags will cover this area and leave some left over.
7 bags cement