If you look at it from the perspective of 11.5 days = 276 hours, this many hours would have to occur on 12 or 13 different days, with an overlap of 12 hours it could be spread either entirely on a 12th day or it could also be placed on the rist day and an additional 13th day would be added. For example
Day 1 <.ooo....1<11.99999... hrs
Day 2 24hrs
Day 3 24hrs
Day 4 24hrs
Day 5 24hrs
Day 6 24hrs
Day 7 24hrs
Day 8 24hrs
Day 9 24hrs
Day 10 24hrs
Day 11 24hrs
Day 12 24hrs
Day 13 <.ooo....1<11.99999... hrs
OR
Day 1 24hrs
Day 2 24hrs
Day 3 24hrs
Day 4 24hrs
Day 5 24hrs
Day 6 24hrs
Day 7 24hrs
Day 8 24hrs
Day 9 24hrs
Day 10 24hrs
Day 11 24hrs
Day 12 12hrs
11
11 hours is 0.458333 days.
If ' L ' is the number of days in one half-life, then the number of half-lives in 32 days is (32 / L) .
There are 7 days in a week so 11 weeks x 7 days = 77 days
7 and a half days are in 180 hours.
A week is 7 days. Therefore, a week and a half would be 10.5 days.
It is about 11 and a half months.
Aboutt 11 (:
It is about 11 and a half months.
11.5 x 24 = 276
A bird and a half lay an egg and a half in a day and a half. So a bird and a half lays 1 egg in 1 day. So a bird and a half lay 11 eggs in 11 days. So 33 birds (= 33/1.5 = 22 lots of 1.5 birds) lay 22*11 = 242 eggs in 11 days. Of course, you need to assume that all birds lay at the same rate throughout the period!
345 days is approximately just under 11 and a half months.
Neither
11
no days just half an hour
9 and a half days = 9 and a half days , 228 hours, 13680 minutes, 820800 seconds.
In 3 days there are 144 half hours.