6 squared = 36 6 cubed = 216 3 cubed = 27 36 + 216 - 27 = 225
One man does the job in 100 days ===> One man does (1/100) job per day.Ten men do (10/100) job in one day, and (60/100) = 0.6 job in 6 days.The 15 women do the remaining (1 - 0.6) = 0.4 job in 6 days.15 women do (0.4/6) job in one day.1 woman does (0.4)/(6 x 15) = (1/225) job in one day.1 woman requires (6 x 15)/(0.4) = (90/0.4) = 225 days per job.====================================Check:10 men = (10/100) = 1/10 job per day15 women = (15/225) = 1/15 job per daySum = (1/10) + (1/15) = (3/30) + (2/30) = 5/30 = 1/6 job per day.The team of 10+15 finish in 1/(1/6) = 6 days. yay !
the answer is actually 29 because ask your teacher he'll ive you the work <3 Answer: PEMDAS-order of operations The square root of 100 is 10. The square root of 225 is 15. The sum of 10 + 15 is 25. The product of 6 and 25 is 250.
10 to the power of 2 is common to all these numbers. Not the answer that I am looking for... ------ How about this: All are evenly divisible by nine. Also, 225 is a perfect square (15), 216 is a perfect cube (6), and the others are prime multiples of nine... but these features are not common to the lot.
0.4
The square number is 225 because 15*15 = 225
square numbers are a number times itself, so 1x1 for example. 15x15=225 6x6=36 the difference is by: 225-36=189
-225 - 6 = -225 + (-6) = -231
0.8824
Factors of 45: 1, 3, 5, 9, 15, 45.Factors of 150: 1, 2, 3, 5, 6, 10, 15, 25, 30, 50, 75, 150.Factors of 225: 1, 3, 5, 9, 15, 25, 45, 75, 225.GCF (45, 150, 225) = 15
37.5
The factors of 24 are: 1, 2, 3, 4, 6, 8, 12, 24 The factors of 225 are: 1, 3, 5, 9, 15, 25, 45, 75, 225
6 squared = 36 6 cubed = 216 3 cubed = 27 36 + 216 - 27 = 225
Original tire size for a WS-6 equipped T/A was 235/70/15 If it doesn't have the WS-6 suspension it was 225/70/15
With WS-4 Suspension...225/70/15 WS-6 235/70/15
Each side measures 15 cm because 1350/6 = 225 and the square root of this is 15
15 gallons if you have the slant 6 225 and gets about 18 to the gallon